The Construction Industry Remains Optimistic


According to the Construction Association of Michigan's (CAM) quarterly business sentiment and expectations survey, we can remain optimistic as business conditions continue to improve.

Contractor sentiment suggests building activity increased to 65.6 in April from 60.0 in March. (Chart #1 all variables).  Meanwhile their expectations for continued growth into the next quarter remain optimistic and  increased to 71.9 in April from 68.5 in March. (Chart #2 all variables)

(Chart 1, Building Activity Increasing <50)




 







Despite the slowing economy as reported in the general media, Michigan regional contractors and construction managers experienced a 2.8% growth in bid requests this year. Awards in the near term are accelerating as contracts for new construction and renovations also increased by 4.8% between February and April 2012, over 2 times the amount experienced in the same period last year.   

(Chart 2 Expected Growth)









Input costs for materials are moderating while labor costs continue to be a challenge. The workforce remains steady to declining and expectations suggest labor costs are moderate with materials. Overall, the industry remains optimistic that it will experience continued growth which is great news for everyone in this region.



About Midwest Mosaic:
Midwest Mosaic, Inc. provides skilled ceramic tile installation services to the residential and commercial construction markets in the tri-state region near Toledo, Ohio USA, including; Detroit, Ann Arbor, Cleveland, Sandusky, Columbus, Dayton, Fort Wayne, and South Bend.  The company features market pricing with superior performance, more value for your money. Midwest clients include Kroger, the #1 US grocery, and Wal Mart, the #1 retailer, as well as many prominent private individuals.  Mosaic is led by Malcolm Campbell, MBA, IMI, CIT, LEED-Green Assoc.  Campbell provides articles such as these for insight into the current market conditions.





Share/Bookmark

Thursday, May 31, 2012

Putting Back; Reinvesting in the Biz

A rare light week for the production crew, we are putting back while there is a lull in the action.

Casey is making repairs to the van and improvements to the interior. A new place to hang trowels opens up a storage compartment, one of six - a 17% improvement in capacity.  Atta boy Casey!

I'm in the basement, cooking up marketing plans.

We'll be back at it next week, on tour with stops in New Castle IN, Wheeling WV; while some of the crew will hang back to finish another house job yet to be revealed.
Share/Bookmark

Friday, May 25, 2012

Project Completion; Berkey Shower


A few days ago we saw the crew smiling and tiling out at this shower somewhere in Berkey, OH. Here's a photo of their completed work. Attaboy guys!

Share/Bookmark

Thursday, May 24, 2012

Ceramic tile on ceilings? Yep we do that.


Share/Bookmark

Wednesday, May 23, 2012

A Bad Day Tiling is Better Than a Good Day at Work



Here's the crew out at a shower in Berkery. All smiles.

Happy tiling!

Share/Bookmark

Monday, May 21, 2012

Fred Z Does it Again; Fireplace Surround

While Fred Z can be found out at The Pool doing the seasonal coping repair, or trying his hand at brick pavers; recently he finished this fireplace surround in travertine mosaics.  Now that we have the photo, we are sharing it with you.  You like?

Share/Bookmark

Friday, May 18, 2012

Brick pavers; Yes we do that!



Here's Fred on a lovely May afternoon in a lovely flower garden putting in a brick paver path. Atta boy Fred.

Brick Pavers; Yep we do that!

Share/Bookmark

Thursday, April 19, 2012

New Project Award: Norfolk & Southern


Midwest Mosaic is going to work for Warren Buffett! 

We just received a subcontract from Ohio Valley based Dunlop & Johnston to provide tile and and installation labor at Norfolk and Southern Railroad's (NYSE:NSC) Bellvue, Ohio facility.  The project features two pairs of employee bathroom and showers plus a washroom in the perch of the yard switching tower.  How cool is that!?

At nearly 4000 square feet, the project will keep a crew of three working for about a month.  Onward job creation!

We are pleased to add Mr. Richard Fajardo to the project to assist compliance with two programs; 1) Ohio Bureau of Worker Compensation Drug Free Workplace and 2. E-Rail Safe, a Homeland Security program. Fajardo writes on HR and management matters at Motivated Innovation, and is an expert in these things.

In 2007, as a bet on the impending recovery, Buffett acquired a stake in NSC through his flagship fund, Berkshire Hathaway.  Mr. Warren knows a good value when he sees it. While the recovery may not be as strong as he anticipated, we knew we had a good value all along, and we're glad to have caught his attention.

Share/Bookmark

Sunday, April 1, 2012

Feature Project; The Tower of Shower (Video)


About the time you were finishing off the last of your Thanksgiving leftovers and were beginning to put up your 2011 Christmas lights, we put the finishing touches on this edition of the Musings Feature Project, The Tower of Shower.

It is now April 2.  The clients, who wish to remain anon, have been happy customers for going on four months now.  Wow! how the time flies. Meantime we have been out doing what LOTC's (Low-Overhead-Trade-Contractors) do, spending time in the field, getting dirty, getting tired, and just plain having fun not having to report to the same old cube day after day to pick up doing the same old same old.

Since the time of Yule, the crew and I have been out in the mud the blood and the beer; finishing up the Mouse House, adding first one Kroger now on the third, as well as stops at the Historic St Patricks, the Bakery Building, and a reprise at the Manor.

As in our last feature, the Forsyth-Vaquero, we bring you loads of content; photos and video. Enjoy.  And be sure to hit the like button above and leave comments below.

Credits:
Design by Mary Glowaki, AIA
Photos by Tina Gionis, MFA
Tiles by Marca Corona, Italy
Distributed by Virginia Tile Company, Livonia MI





Linear Drain; You Know You Want One!


Two Story Niche

Spacious, No!?
Video Reveal


Before Video


Link to Customer Feedback (here)

Happy Tiling!
Share/Bookmark

Friday, March 30, 2012

The Perfection Premium; Can You Afford it?

500-400-20=80.

I have two tile layers.Both have Own tools and are fully capable of running large tile jobs and leading tiling crews.

I have two identical projects; new school buildings within the same school district.  The projects are located within my area of operations and close to both leaders' homes. Both men lead similar crews such that one could not differentiate the outcomes of one crew from the other based on individual or group abilities.

Now leader one is quite mercenary hard working and well loved by his crew. He wastes no effort in all that he does toward goal accomplishment, completing tile work.  He harbors no wasted effort in his crew and similarly he is always teaching his speed tricks, and how to focus on completion as opposed to quality. As you can imagine, his work is not without defect.  At the same time he is ever professional and expects the same from his crew, so his quality control is still quite tight.  Its just that he has developed an intuitive understanding of where he and his crew may bend on quality

Leader two on the other hand is more quality oriented and demands near perfection from his crew. He is ever critical about the work of his fellows. Rarely gives positive feedback. 

Leader one uses 400 mandays to complete his school, leader two 500 mandays.  Leader two has a zero-punch list, he requires no additional effort going back to fix his work, while leader one requires 20 mandays of rework to remedy defects in his work all of which are but minor nuisances.

The 80 manday difference is what I call the perfection premium.  Can you afford it?

Share/Bookmark

Wednesday, March 28, 2012

The Crew at Kroger Mt. Vernon

Here's the Crew on Mosaic's third Kroger project in nearly as many months.  Left is Casey and right is Eric.  Eric's a 15 year veteran of tile setting while Casey is the noob.  A quick study he, Eric and I are teaching him the weirding way.

Casey's a quick study.  Gets it the first time.  Humble and accumulating own tools. Gotta love that. Eric did high end custom homes in Stone Oak during the housing boom.  Not so much of that to be had these days so he's glad to be with us, we feel the same.


Both fellows are from Toledo's North End.  Woodward HS products through and through, they enjoy regaling me of triumphant stories from the 'hood.  Wish I could video tape them to get you some reality TV type content for you.  Warning though some of it is R-A-W raw.  We sure laugh it up on our commute back and forth each week to this store in Mt. Vernon, OH.  You just have to be there.


And where is the boss??????????

Off for a scoop of ice cream?

Back to work you knuckleheads!

Happy Tiling!
Share/Bookmark

Tuesday, January 24, 2012

New Project Award; Historic St. Patrick's Church (Video)

Deco Tile
One of our customers gave us the contract to tile the rectory shower room at the Historic St. Patrick's church, Toledo, Ohio. The current resident, Rev. Dennis Hartigan, is enthusiastic about the project having selected the classic marble look with a Etruscan Brown tile from American Olean's Catarina line.  The room will feature a 57" wainscot with a deco band, full wall tile in the shower over top of a custom shaped concrete floor with integral rubber waterproofing, and a recessed soap dish; pretty much the Full Monty for tile work in a residential bathroom situation.  The project will provide the crew at Mosaic 10 man days of work. Ready for tile video below.  Happy Tiling!


Etruscan Brown

Share/Bookmark

Monday, January 16, 2012

The Four Factors of Performance; or How You Rate

I'm gonna put this down real simple. If you are doing direct labor in the tile biz, this is how you get rated.
Performance

The four factors of performance

1. Productivity - By and large, tile work is bid, secured, and paid by the square foot.  You are rated based on how many square feet of finished goods you turn per man-day.  

Don't be confused by the day where you drop in 300 square feet of tile to thinking you are a 300 square foot a day hand, because you are not that fast.  I have yet to meet that guy.  You still have to go back and put in the 50 final feet the next day and grout it the following and even go back a fourth day (half-day really) to final clean and caulk.  That's a 100SF/MD rating in my book.  What I am looking at is 350 square feet "in and grouted", turn-key work, taking three and one half days. Or, 100 square feet per man-day.  

I figure my jobs with a productivity goal in mind, priced with an underlying value of labor, the productivity goal is based on over 15-years experience, meticulous record keeping on the past performance of 100's of men (a few women too) on 100's of jobs (jobs with a wide range of scope - big vs small, thickset vs thinset, cement grout vs epoxy and so on).  This is a science to me.  You are rated on whether you under or over perform the goal set by so many competent hands who have come before you.  

When you provide a good or service at a cost less than the price paid, you have a business.  You have no business being in the business if you have it the other way around.  That's called charity.  Don't be a charity case. Do shoot to over perform the goal. It's rewarding.

2. Quality - Quality is vitally important for getting paid. So, is it any wonder that quality matters to performance?  

Quality is a little trickier to measure than productivity.  Let's just say, you know it when you see it.  This goes for the expert and the lay person (our customer) as well.  Your work should exhibit PLFS (Plum Level Flat and Square), water should flow to drains (no bird baths), completed tile work should be as clean as when it came out of the box (no grout haze, no glue smears, and no pencil marks - no Sharpies please; I know a good place to stick them).  Grout should be uniform in color and tooling, full joints, and no shrink cracks. 

You are responsible for quality control; I am responsible for quality assurance.  Your guiding principle should be, "Would you accept that in your house?".  If so, proceed.  If I question your work, it is because I am looking at it with an eye to sell your work to our customer.  As stated above, I have a lot of experience trying to sell crap work back when I was young and dumb.  It cost me a lot of money.  I can assure you if I don't think I can sell your work, I don't think I can long pay you to work for me. 

Tidy Work Area
The tilers work area should be kept clean and tidy.  I have heard other trades refer to tilers as pigs.  Look, in case you haven't noticed we take up a big foot print when we are on the job, we tend to linger where there is tile. And, we start messy.  Is it any wonder then that "piggy" sticks?  But this doesn't need to be, for we finish clean and beautiful.  Emphasize clean and beautiful each day and with respect toward the work of others.  Pay particular attention to your slops, the cement slurry in the bottom of your wash and whip buckets.  See that these do not find their way into the heirloom rose bushes or the mop sink trap.  Both are expensive to replace.

Even though rating quality is difficult, I can use rework as a proxy for quality.  Where zero punch list is the goal, rework is the measurable.  On large jobs (team basis), quality is measured in terms of dollars rework over project value, the smaller the better.  On small jobs (individual basis) rework has a direct impact on your productivity.

3. Attendance - This is too simple. How can you perform if you don't show up?  

On an individual basis this makes complete sense; But let's look at it on a group basis.  I build tile teams of three to five guys to tackle big jobs.  You don't think it matters if you, as one of three or one of five, do not show up on any given day?  Do you think it matters to Lebron James if he has to go against the Celtics with four for the day?  Same goes on the tile job, just like basketball tile is a game of bodies on the floor.  Miss one man for a day is bad enough, but could you imagine if each guy on a five-man crew missed one day each (different days) all in the same week?  How can I promise our customer to deliver their floor on time if, provided room for five on the job, I only give them four?  Missing my delivery I would not long have their business, so I cannot long tolerate absenteeism. 

You are measured on days worked over days scheduled for work.  For example, I schedule you for 100 work days in a year and you miss 10, you show up the other 90.  That's a 90/100 (90%), an A in school an F with me.  Here STFU means show up. 

4. Attitude - This factor is by far the most subjective, and is so by design.  On a scale of 1 to 5, one being worst 5 being best, do you bring me problems? Or, do you bring me solutions?  Do you grind me or others on the team down? Or, do you build us up?  

Muzzle it Bitches
Attitude is everything.  I kid you not.  I have bounsed slow guys who; do A-quality work, show up always, are task oriented rarely taking things personally, and once or twice in a period help me solve particularly difficult situations.  I call this rewarding maturity.  I have fired producers who; make excuses for their defects, miss work, are late a lot, and fail to advise me in a timely fashion about inventory on the job until they grab the last tile.  I call this addition by subtraction.

Always bring your best attitude to work. It may just be the factor which keeps you employed.

While not an exhaustive list, in my experience if an individual scores highly on these four with me, then he or she is doing a whole host of little things which lead to on the job success and customer satisfaction.  

What do you think?

Share/Bookmark

Monday, January 9, 2012

CAM Construction Activity Index for SE Michigan

From CAM Online

CAM, the Construction Association of Michigan, reports the results of its October Activity survey, in alignment with the previous Spending Plans survey. Survey is for commercial construction, non-residential building. This is comparing actual to expectations in a sentiment based format. Information is lagging and does not account for current events, such as; October Stock Market rebound, November Elections, improving headline unemployment.

Graph of Actual Data "Activity Index"
Source: www.cam-online.com

Graph of Expectations "Spending Plans Index"
Source: www.cam-online.com
Bottom Line: Respondents are seeing fewer bid opportunities, fewer awards, and an increase in material prices.  


My Analysis

My experience confirms this too.  While I have seen as much bidding as I can handle, I have had to increase my range of interest (drawing a circle around Toledo, the circle just got bigger), yet my awards (bid-to-win ratio) are down on a relative basis.  In the meantime my drywall supplier keeps sending me letters about double digit increases in drywall and metal studs, not that I buy much of these, but they are important proxies. Meanwhile DalTile is currently advising me through their quote notes, that come June all orders will bear a 3% freight surcharge. While not double digit inflation, it is nonetheless upward.  Price increases are notoriously hard to pass on to clients, especially while activity is down. This is extreme margin pressure.

Expect the shake out to continue. Only the leanest most professional organisations will survive;

Some suggestions:

  • Find innovative ways to cut overhead
  • Speed up receipts.
  • Watch those credit lines.
  • Call on your customers, ask for their business.
  • Be very selective about who gets your best number.
  • Stick with the winners.
Happy Tiling



Share/Bookmark

Wednesday, January 4, 2012

Tec Specialty Rolls Out Power Grout (Video)

Bob Dailey from Tec Specialty joins us to describe the features and benefits of Power Grout. With free sample in hand, we look forward to using it on The HiYaa! project this month.  Thanks Bob.

Happy Tiling!


Share/Bookmark

Tuesday, October 25, 2011

New Project Award; Kroger Toledo

Midwest Mosaic just received a contract from a General Contractor out of Chicago to provide (furnish and install) tile in a local area Kroger store.  The project covers two pairs of multiple occupant washrooms, floors and walls, plus patch work related to the GC's operations elsewhere inside the store.  With a fast track schedule, Kroger Toledo will provide the crew at Mosaic with just over 30 man days of work in the next two months.  
On this project, which is but one store of Kroger's larger within-the-walls re-imaging program, the Cincinnati supermarket conglomerate sources its tile from Pantheon Tile out of Carrolton, TX.  

Mosaic obtained the work through its plan and spec marketing efforts on the BidClerk network, of which Mosaic only recently joined.  Look for an upcoming post about Plan and Spec Marketing 101.

Share/Bookmark

Thursday, October 6, 2011

How To Modify Linear Drain for Rubber Pan Liner System

For those of you who, like me, prefer 40-mil PVC rubber waterproofing liner, a-la TCNA B-414/415 as their shower waterproofing system of choice, because it is tried and true and less expensive than membrane alternatives, and you want to use one of the awesome new linear drains from Schluter (Schluter Line) or Noble (Freestyle) which work so well with large format tile and slab shower floors, but are designed to integrate with their pricey proprietary membranes and are damage prone by virtue of their position within the floor section, here is a video which shows you how to modify the drain to work with a PVC clamping ring.



Disclaimers: No Schluters or Nobles were hurt in the making of this film, but do not expect either firm to give you a product warranty by following this how-to.  You are on your own, but then haven't we always been on our own with TCNA B414/415.  So far, so good.

Disclosure: I am friends with both these firms. I buy lots of their products and you should too.  But I'm not about to put my waterproofing on top of a shower floor section. (too risky for me)

Happy Tiling!


Share/Bookmark

Saturday, October 1, 2011

Quote from IRS Auditor

"The trick is to stop thinking of it as "your" money." 
-IRS Auditor
Share/Bookmark

Friday, September 23, 2011

Project Update: Tower of Shower (Video)

Tower Base Complete
In this edition of the Tower of Shower, we bring you two video's; one at demo complete stage while the second shows the footer (the base) of the shower ready for concrete.






The water werks beneath the tower.

With the concrete complete topside, we went down below and got our water supply lines squared away in beautiful copper. Now onto building the tower plus a glass block window and the drain lines.

Happy Tiling!

Share/Bookmark

Friday, September 16, 2011

On Prices Paid; Why I don't do in Home Estimates

Last Saturday, I made a house call to quote a friend on some tilework she is considering. She recently had her 5'x5' bathroom floor done by someone else, and to my mind the fellow did an admirable job, so she must have had me look at doing her backsplash (37sf) and wainscot walls (40sf) in said bathroom in deference to our said friendship. So with her I gave - as with you I give - max transparency, because it is just good business. That being said, the experience along with this little idea below from Seth Godin, gave me impetus to write about prices-paid, a file in my folder I've wanted to weave into the blog.

From Seth Godin's Blog

Building a job vs. building a business
Either can work, both do, but don't confuse them.
The shoemaker/copywriter/plumber who seeks a regular itinerary of gigs is building a job, a job with multiple bosses at the same time there is no boss, but it's still a job. You wake up in the morning and you do your craft, with occasional interruptions to do the dreaded looking-for-work dance.
The entrepreneur is in a different game. For her, the gig is building the gig.
On Prices-Paid: Prices-paid is what you expect to be paid for the the work you quote. It is an expectation concept. As with all expectations, only some are met.  Probability is in play with prices-paid.  Some will be met while others no.  A lot of it has to do with your counter party, your potential client.  Does your offer meet their expectation.  
Intuitively we try to maximize the probability our expectation for prices paid will be met.  
One idea in this approach is to minimize price.  Any one who needs to sell a house in this market can quickly get the notion of how painful this approach can be.  But for some its a matter of survival, and so they will whore themselves for next to nothing; however, clients understand little is expected from a whore after services are rendered.
Another approach is maximize pitches to clients who want YOU or who expect to pay prices at your level. This is the targeted approach.  Targeting follows good marketing, good research and good story telling, good content and good distribution.  Marketing and entrepreneurship are intertwined.
Returning to my experience last Saturday: I asked her what she paid the man to do her floor. She said $100.  His work included removing a couple layers of vinyl and giving the commode a round trip to the tub (for the uninitiated, that's removing and replacing the toilet).  The work required all of one day.  I told her that it was a good price for the effort involved.  (She found herself a whore, a day laborer really.)  
No problem, we're all seeking a whore every time we ring the register at Wal-mart. I'm indifferent on the subject. Times are tough and day laborers have mouths to feed just the same.  
I gave her an order sheet she could use to go tile shopping, and then I gave her my prices, $250 for the wainscot and $350 for the backsplash, $600 in all for about 3X what her day laborer did on a square foot basis.  My offer was 6X the money while no adjustment for demo and toilet levitation only increases my price disparity. 
What happened here is she hit some minimum charge thresholds I keep in mind. This goes back to my days in the union tiling company where we could not afford to send a man out of the warehouse for less than $500/day. 
At this moment, how high do you think my expectancy was for this offer?  If you guessed zip.  You are correct. As I said, I'm indifferent. Her viabilty as a prospect was very low, so my duty here was reserved to information. I told her that that I believed she could improve on my prices, perhaps with the fellow who did her bathroom floor. She seemed a bit surprised. 
I asked her to consider what she earns per hour (disclosure she works in the penal system as part of a collective bargaining unit) along with the benefits and her employer's overheads related to her employment.  (She's my friend, so we can have this kind of frank discussion about her cost to her employer and the relative value embedded in the price she paid for tilework.)  Then considering her line of work keeps her fully employed while trade work at the individual level keeps a fellow productive about half to three quarter time, so for him to begin to approach parity to what she costs her employer he would need to charge double her employer's cost.  About $500 per day.
On the significance of Seth's post: It truly boggles the mind who would pay that much for day labor.  I wouldn't, and I don't. Yet if you are building or running a business, your employees, and that begins with you, will require an hourly rate and benefit package which approaches the prevailing rates in your area while being reasonably well anchored in the market in which you have a high probability of realizing your prices paid. If your market is day labor, then so be it, but understand...you are working on a job. It will never get better, only worse. Forget about ever having a nice truck, health insurance, and once you knees give out forget about the nest egg, because you will not have one. All others are free to identify their target and create their story which wins the day. This is my story. This is my business. I encourage you to follow it.
Conclusion: This is exactly why I do not do house calls. (friends are exceptions) When I get referrals, I do them over the phone or I don't do them. Please call the next tile guy. Like I said, I'm indifferent. On the phone, I have a sales routine, an excel spreadsheet and all. I can walk you through a measure. I can ask you a series of questions to arrive at a reasonable offer for me. Takes no more than 15 minutes. (some day I will roll this up on-line in a little thing called mytilebid.com). If you do get me to come to your house, it will be to finalize your tile order and collect an earnest deposit. Not in that order. That is how Home Depot runs their installed sales operation. Works for me. Regardless of the visit, I can make you smarter about your tile job with one phone call. So, you can feel confident engaging someone for a price less than my X. But there is one thing I would rather do less than waste an entire Saturday morning to discover I am competing for 1-2 days work at $9- $10 per hour, and that is to actually work for $9-$10 per hour.
Happy tiling!